Structural design and construction of catway for the Fourth Nanjing Yangtze River Bridge
Luan Changhua, Shen Bin
Strategic Study of CAE 2013, Volume 15, Issue 8, Pages 48-53
Keywords: the Fourth Nanjing Yangtze River Bridge catway structural design catway erection catway adjustment catway demolition
The research on method of geometry-control during erection of the short-line bridge
Wang Min,Zhang Yongtao,Liu Jinghong,Liu Yi,Huang Yue
Strategic Study of CAE 2009, Volume 11, Issue 11, Pages 79-81
Focus on error control during fabricating and suspended splicing of box girders with segmentation method. After the analysis of the error reasons, and the combination with practical engineering—Sutong B2, it discussed control method, computing method and sensitive analysis method of linear control of prefabricated pre-stressed continuous beam bridge assembly with short line method.
Keywords: geometry-control error analysis least square method erection of the short-line method
Key construction techniques for superstructure of the Fourth Nanjing Yangtze River Bridge
He Chaoran,Pan Guilin,Li Youwei
Strategic Study of CAE 2013, Volume 15, Issue 8, Pages 42-47
Keywords: Yangtze River Bridge two-tower three-span suspension bridge superstructure construction main cable erection steel box girder erection
Lu Wei,Deng Hengchang,Zhang SHengli,Yang Ming,Yu Yeqiang,Li Pingli,Li Runzhe,Xiao Anbin
Strategic Study of CAE 2010, Volume 12, Issue 7, Pages 47-52
Keywords: suspension bridge steel box-girder Xihoumen Bridge anchor-side of north side span erection and adjustment
Unstressed state control method for process control of structure formed by stages
Qin Shunquan
Strategic Study of CAE 2009, Volume 11, Issue 10, Pages 72-78
This paper establishes a mechanical equilibrium equation for structure in any construction process of bridge formed by stages, and thus concludes that the core of process control for stage-constructed bridge is the quantity of unstressed state of structural elements. The control and adjustment of quantity of unstressed state of the structural elements provides a solution to the problem of rection calculation for bridge constructed by stages. Based on the principle that internal force and displacement have nothing to do with the construction process on the premise of a constant quantity of unstressed state, parallel operation of multiple working procedures can be put into practice, and the automatic filtration of influences from temporary load and temperature during construction can be therefore well realized.
Keywords: bridge constructed by stages unstressed length unstressed curvature parallel operation erection calculation
A Comparative Assessment of Aerodynamic Models for Buffeting and Flutter of Long-Span Bridges
Igor Kavrakov, Guido Morgenthal
Engineering 2017, Volume 3, Issue 6, Pages 823-838 doi: 10.1016/j.eng.2017.11.008
Keywords: Buffeting Flutter Long-span bridges Bridge aerodynamics Bridge aeroelasticity Erection stage
Lu Zhongmin
Strategic Study of CAE 2010, Volume 12, Issue 11, Pages 20-24
Keywords: offshore wind farm site selection voltage elevation method design and construction of foundation erection
Technology for long cable erection of a thousand-meter scale cable-stayed bridge
Rao Huarong,Deng Huibin
Strategic Study of CAE 2009, Volume 11, Issue 3, Pages 71-74
In the background of the construction of Sutong Yangtze River Bridge (short as Sutong Bridge), the cable construction method and techniques of a thousand-meter scale cable-stayed bridge are instroduced, Some key constrction techniques, such as outspreading cable on deck, installing cable at pylon, pulling adn fixing cable at the attachment with decks and cable PE protection, are discussed.
Keywords: stay cables of a thousand-meter scale cable-stayed btedge construction technique for long cables long cable construction
Key technology research on construction for the middle tower of suspension bridge
Tian Wei,Liu Jianbo and You Xinpeng
Strategic Study of CAE 2012, Volume 14, Issue 5, Pages 23-28
Keywords: Bridge anchor pier positioning real time monitoring control measure in final stage whole process control erection
Title Author Date Type Operation
Structural design and construction of catway for the Fourth Nanjing Yangtze River Bridge
Luan Changhua, Shen Bin
Journal Article
The research on method of geometry-control during erection of the short-line bridge
Wang Min,Zhang Yongtao,Liu Jinghong,Liu Yi,Huang Yue
Journal Article
Key construction techniques for superstructure of the Fourth Nanjing Yangtze River Bridge
He Chaoran,Pan Guilin,Li Youwei
Journal Article
Erection technique of steel box-girder at anchor-side of north side span in Xihoumen suspension bridge
Lu Wei,Deng Hengchang,Zhang SHengli,Yang Ming,Yu Yeqiang,Li Pingli,Li Runzhe,Xiao Anbin
Journal Article
Unstressed state control method for process control of structure formed by stages
Qin Shunquan
Journal Article
A Comparative Assessment of Aerodynamic Models for Buffeting and Flutter of Long-Span Bridges
Igor Kavrakov, Guido Morgenthal
Journal Article
Study on key technologies employed in planning and construction of Shanghai Donghai Bridge offshore wind farm
Lu Zhongmin
Journal Article
Technology for long cable erection of a thousand-meter scale cable-stayed bridge
Rao Huarong,Deng Huibin
Journal Article